Chicagoland Apartments Void Fill and Foundation Lifting

18,000 sqft apartment building suffering from voids beneath the slabs, ranging from 5” to nearly 2’ caused by stratified compacting
About The Project
Contractor Atlas
Project Location Meadows, IL
Product Used Terrathane™ 24-003

Problem

  • 18,000 sqft apartment building suffering from voids beneath the slabs, ranging from 5” to nearly 2’ caused by stratified compacting of historically hydric wetlands’ sedimentary soil and multiple water and sewer main breaks over the years
  • Voids caused uneven floors throughout the complex and created risk of mold issues
  • Project needed to be completed with minimal disruption to the tenants

Solution

  • Locate the voids using DCP tests and develop an injection plan to remediate the issue
  • Stabilize, lift, level and void fill the flooring using the Terrathane 24-003 polymer
  • Work within daytime hours and isolate the installation locations to minimize interruption to tenants

Results

  • Project completed with minimal disruption to the tenants
  • The 24-003 polymer worked exceptionally well in the saturated soil layers due to its hydro-insensitivity
  • Satisfied customers due to fast repair, cleanliness of job site and professionalism of crews

Project Gallery

Other Case Studies

Rocking Slab Stabilization raising polyurethane foam Arizona

Ram Jack Arizona uses NCFI TerraThane 24-003 to Stabilize 47 Rocking Slabs

Ram Jack Arizona used NCFI TerraThane 24-003 to stabilize the joints of 47 slabs, completing the initial phase of the project in approximately 12 hours.

Read More →

Slab Fix, LLC Repairs Florida Seawall using NCFI Terra-Lok™ 24-120 Single Component System

Over time, the homeowner noticed signs of deterioration in their concrete seawall. Tidal fluctuation was causing soil erosion underneath and behind the seawall. Terra-Lok™ 24-120 polyurethane was used in the bulkhead repair.

Read More →