About The Project | |
---|---|
Contractor | Mudpumpers Mudjacking, Inc. |
Project Location | Fargo, ND |
Product Used | Terrathane™ 24-486 |
Problem
- Erosion underneath concrete slab highway along Interstates 29 and 94 near Fargo, NC was creating settlement that led to uncomfortable, unsightly and potentially dangerous driving conditions
- Some bridge approaches cause the concrete slabs to drop anywhere from 2 to 4 inches
Solution
- Inject the fast expanding, high-density TerraThane™ polyurethane below the highway and bridge approach slabs to stabilize, lift and realign the slabs
- Lift anywhere from 40-80ft of the road to meet each newly lifted bridge deck
- Work with the TerraThane technical support staff
Results
- Lifted, Leveled, and stabilized 22 bridge approach slabs with over 120,000 lbs of TerraThane™ 24-486 polyurethane
- Support from the TerraThane support staff to help in technical and injection approach helped ensure a successful application and project