Void Filling

Neshoba Spillway Rehabilitation

Spillway rehabilitation stabilizing soil subsidence and erosion caused by water seepage through the dam in Neshoba County, MS

Reeds Creek Fish Hatchery Leakage Repair With Polyurethane

NCFI TERRATHANE™ 24-042 used to fill voids for reed creek fish hatchery​ leakage repair and soil subsidence stabilization. The pipes were experiencing leakage throughout the system that was causing soil washout and, subsequently, large voids underneath the raceway and settlement and cracking in isolated areas of the raceway that was leading to additional water loss.

USG Stabilizes a Sinkhole and Seepage Tank in Pennsylvania

Sinkhole in Pennsylvania under a stormwater drain stabilized using Terrathane 24-003 Dual Component Polyurethane​. Utility Services Group was contracted to remediate a sinkhole that was causing soil loss and settlement around nearby structures.

Strata-Fill 24-023 Low Exotherm Polyurethane System

24-023 The Strata-Fill™ 24-023 is a low-exothermic polyurethane system specially formulated for pipeline trenchbreaker applications. Polyurethane trenchbreakers provide pipeline companies with a long-lasting pipe stabilization system to ensure long-term stability and minimal settlement. About The System 24-023 Technical SpecificationsStrata-Fill™ 24-023 Density 2.0 – 2.2 pcf Compressive Strength 44.0 psi Cream Time 1 – 2 Second …

Strata-Fill 24-023 Low Exotherm Polyurethane System Read More »