Louisville Stormwater Overflow Cavity Fill Project
The city of Louisville needed to fill the cavities in the rock to create a flat plane in order to tie in rebar forms to construct the facility’s concrete walls and foundation.
The city of Louisville needed to fill the cavities in the rock to create a flat plane in order to tie in rebar forms to construct the facility’s concrete walls and foundation.
Erosion underneath concrete slab highway was creating unsightly and potentially dangerous driving conditions requiring a lift under I-29 and Highway 94
Potholes, settled roadway and bridge approach slabs, dips, caused by a variety of problems such as soil subsidence, vibration, washout, poor base soils
Polyurethane trench breakers for a 24-mile Natural Gas Distribution Pipeline
Void fill, Soil Stabilization, Inflow and Infiltration Mitigation of over 1 mile of Culvert in Richmond, BC
TerraThane 24-042 is used to backfill and stabilize a 14′ Stormwater Culvert in North Carolina
Spillway rehabilitation stabilizing soil subsidence and erosion caused by water seepage through the dam in Neshoba County, MS
Port of Seattle was experiencing severe settlement in its stormwater conveyance system.
Kansas City Historic Landmark the American Royal saves millions by using new technology for void filling and concrete lifting and leveling.
1,400 ft of pipeline trench breakers, pillows, and pads on a 58-degree hillside slope