North Dakota I-20 and 94 Highway Slab Lift
Erosion underneath concrete slab highway was creating unsightly and potentially dangerous driving conditions requiring a lift under I-29 and Highway 94
Erosion underneath concrete slab highway was creating unsightly and potentially dangerous driving conditions requiring a lift under I-29 and Highway 94
Potholes, settled roadway and bridge approach slabs, dips, caused by a variety of problems such as soil subsidence, vibration, washout, poor base soils
12-year-old New Bern Riverfront Conference Center’s floors were settling due to an old riverbed subsiding and needed to be lifted
18,000 sqft apartment building suffering from voids beneath the slabs, ranging from 5” to nearly 2’ caused by stratified compacting
Setting and Stabilizing 75′ lighting poles for a little league baseball park using Strata-Fill 24-018 polyurethane.
Soil Subsidence and base soil loss led to sinkhole-like conditions and the collapse of a walkway at a Kentucky Water Treatment Center.
Polyurethane trench breakers for a 24-mile Natural Gas Distribution Pipeline
Void fill, Soil Stabilization, Inflow and Infiltration Mitigation of over 1 mile of Culvert in Richmond, BC
TerraThane 24-042 is used to backfill and stabilize a 14′ Stormwater Culvert in North Carolina
Spillway rehabilitation stabilizing soil subsidence and erosion caused by water seepage through the dam in Neshoba County, MS