Ram Jack Arizona uses NCFI TerraThane 24-003 to Stabilize 47 Rocking Slabs
Ram Jack Arizona used NCFI TerraThane 24-003 to stabilize the joints of 47 slabs, completing the initial phase of the project in approximately 12 hours.
Ram Jack Arizona used NCFI TerraThane 24-003 to stabilize the joints of 47 slabs, completing the initial phase of the project in approximately 12 hours.
Liftech, of Denver, CO, lifts bagel bakery freezer floor 4 inches using the Terrathane™ 24-003 geotechnical polyurethane system.
Erosion around three-story, in-ground parking garage in Dallas’ uptown area required void-fill around its structural piers
Soil subsidence and erosion caused voids that needed to be filled beneath the Center’s concrete slab foundations.
Erosion underneath concrete slab highway was creating unsightly and potentially dangerous driving conditions requiring a lift under I-29 and Highway 94
Potholes, settled roadway and bridge approach slabs, dips, caused by a variety of problems such as soil subsidence, vibration, washout, poor base soils
12-year-old New Bern Riverfront Conference Center’s floors were settling due to an old riverbed subsiding and needed to be lifted
18,000 sqft apartment building suffering from voids beneath the slabs, ranging from 5” to nearly 2’ caused by stratified compacting
Void fill, Soil Stabilization, Inflow and Infiltration Mitigation of over 1 mile of Culvert in Richmond, BC
TerraThane 24-042 is used to backfill and stabilize a 14′ Stormwater Culvert in North Carolina